Clue: Flower is behind schedule and while round in size, flattened at the ends
We have 1 possible answer for the clue Flower is behind schedule and while round in size, flattened at the ends which appears 1 time in our database.
Possible Answers:
Last seen in:
Related Clues:
- Not perfectly round
- Flattened at the poles
- Certain monastery resident
- Flattened, like the Earth
- Layperson in a monastery
- Squished at the poles
- Monastic auxiliary
- Pumpkin-shaped
- Not quite spherical
- Squeezed at the ends, as leaves
- Tangerine-shaped
- Like M&M's
- Flattened at the ends
- One dedicated to monastic life
- Of spheroid, flattened at poles