Clue: Put up a long lead and clear food from kitchen in Madrid
We have 1 possible answer for the clue Put up a long lead and clear food from kitchen in Madrid which appears 1 time in our database.
Possible Answers:
Last seen in:
Related Clues:
- Simmered Spanish dish
- Seafood-and-rice dish
- A number jump over the dish
- Food for Father Fitzgerald
- Pea soup everyone sent back - another dish wanted
- Food Troy cut away from bone
- Spanish dish of rice, shellfish, etc
- Spanish dish of rice, meat and seafood
- Father goes to the Spanish and the French for dinner in Madrid
- Inspiration for jambalaya
- Spanish dish of rice, shellfish and chicken
- Saffron-flavored Spanish dish
- Saffron-flavored rice dish
- Spanish rice dish with saffron
- Saffron-rice dish